Linear Accelerator Machine

Hartford HealthCare – St. Vincent’s Medical Center Elite worked with Varian Medical Systems to upgrade one of the existing vaults at the medical center with this new Linear Accelerator (Linac). The machine offers advanced precision. This enables higher doses of radiation to be delivered to the tumor. Radiation exposure to surrounding healthy tissues and organs…

Read More

Central Sterile Supply Department

Hartford HealthCare – St. Vincent’s Medical Center, Bridgeport, CT The Central Sterile Department is the most important piece of any hospital. It’s fundamental role is to receive, clean, decontaminate, package and sterilize any medical devices that can be distributed. Elite worked closely with the hospital, general contractor, SPD staff and Steris Medical Equipment Company to…

Read More

Connecticut Orthopaedic Institute 7th Floor Renovation

Hartford Hospital St Vincent’s Medical Center, Bridgeport, CT The seventh floor at St. Vincent’s Medical Center is now known as the Connecticut Orthopaedic Institute floor. The North and East wings of this floor underwent a full renovation and redesign unlike any other floor in the hospital. There are 23 brand new state of the art…

Read More

Hartford Healthcare COVID Testing Site

Hartford Healthcare - Bridgeport Testing Site

Harbor Yard City Transit Garage in Bridgeport, CT After touring a handful of potential locations for a larger COVID-19 testing site, the logistics team concluded that the parking garage located at the Harbor Yard would be the most beneficial. Since the testing site itself is located on the fourth floor, it allows the traffic to…

Read More

St. Vincent’s Medical Center Off-Site DMARC Extensions

st. vincent's medical center dmarc extensions

With Hartford Healthcare purchasing St. Vincent’s Medical Center and their off-site properties, Elite was hired to run the infrastructure portion for the new network. Hartford Healthcare wanted to convert and upgrade the existing networks in over twenty off-site practices to their network standards. Elite worked with Hartford and Frontier Communications and spent nearly three months…

Read More

MRI Upgrade

St. Vincent’s Medical Center, Bridgeport, CT This was a five week very fast pace job with many moving parts. Before the existing MRI Lab could be demoed, a temporary MRI trailer was installed on the side of the building. After tents, ramps and temporary lighting was installed outside, construction then began inside. After demo, our job scope…

Read More

Level 6 Renovation

St. Vincent’s Medical Center, Bridgeport, CT Our assignment on this project was to update the oldest floor in the medical center.  Wings North & South went in two phases to accommodate and work with the medical professionals during construction.  On this level, every room was renovated with a new head wall medical electrical system, lights and…

Read More

Interventional Radiology Lab

St. Vincent’s Medical Center, Bridgeport, CT Our task on this project was to work with Phillips Healthcare for a successful renovation for this new lab and equipment upgrade. This lab received all new piping for Phillips equipment in the lab and equipment closet. Also, new medical lights were installed along with renovating the control room. 

Read More

Electrophysiology Lab I & II

St. Vincent’s Medical Center, Bridgeport, CT Electrophysiology Lab I This project from start to finish was completed in 10 very aggressive weeks. In those ten weeks after we demoed the lab, we had to install conduits for GE Healthcare below the floor, walls & in ceiling per their equipment requirements – along with conduits for Life Safety…

Read More